Permax Protection

Blog

Stay up to date with our latest opinions, facts and research by reading our latest blogs below

How preparation impacts performance When it comes to fire rating, there is one core truth which overrides all else. If you fail to prepare the surface, the fireproof coating will not work to the level desired or required.
Through this article we thought we would point out a few things you should to consider prior to the application of any timber or steel fire rating coating:

This entry was tagged : "Passive Fire Protection", Tips

The Role of Steel Sections on the Use of Intumescents Did you know that the thickness of any fire protection material such as an intumescent coating depends on a number of factors? There are a number of aspects you need to consider when choosing the right passive fire protection, and in this bog, we break it down for you. 

Key projects

Nullifire products have been proudly used as the intumescent of choice on a number of recent constructions including:

5 Martin Place SYDNEY Old Commonwealth Bank Building ‘The Money Box’

Nullifire SC902 “Fast Track’ Hybrid intumescent basecoat was sele...

Brisbane International Airport - Air New Zealand lounge

Brisbane International Airport is mid-way through planned upgrade works. Perm...

Carrara Gardens Golf & Tennis Academy - Gold Coast

Nullifire SC902 was selected for this project for its proven track record of ...

Gold Coast Turf Club

Originally we were requested to fire rate all structural steel on the project...