Pirtek Stadium – Stage 1 Upgrade

Nullifire SC902 was applied on all steel members requiring 120 min fire protection. The Nullifire SC902 ‘Fast Track’ technology could meet the construction program demands to complete the project prior to the first home game of 2015 NRL season.

Originally specified in both intumescent and vermiculite coatings, Nullifire SC902 was applied on all steel members requiring fire protection. Only Nullifire SC902 could meet the building program demands to complete the project prior to the first home game of 2015 NRL season. Being the Parramatta Eels home ground it is now protected with the latest fire protection technologies offering a lifetime of the building warranty for all internal steel members coated in Nullifire SC902 to an FrL of 120minutes.

Nullifire SC902 can only come off if physically removed which is why Nullifire SC902 is the only product offering a lifetime of the building warranty for all internally exposed structural steel members coated with Nullifire SC902.

It is worth noting that we have also applied Nullifire successfully to Penrith Stadium in Sydney’s West.

Product Used:

Nullifire SC902

Get in Touch

Speak to the Australian leaders in passive fire protection

You are about to download a file from the Permax site. Please note All technical advisory notes generated by Permax are based on research papers, indicative fire tests and any other existing evidence. These documents should not be used as an official evidence as design engineers should review the information and determine the reliability of the documents.

Permax constantly update the documentations based on the new fire testing outcomes and change of standards and regulations. To ensure the documents you read are up-to-date, please contact the Permax technical team.